Central kitchen installation
A project designed for comfort and efficiency
Comfort, Efficiency, and Indoor Air Quality Excellence
HVAC and Building Automation Installation
Store Renovation
Ventilation and Climate Control Installation
Next-Generation Health Center
Bradco New Industrial Facility Installation
HVAC and DHW
Climate Control System
Industrial climate control
Solutions for Greater Efficiency and Sustainability
Air Conditioning, Ventilation, and Smoke Control
Comfort and Efficiency in Sports Practice
New FedEx Building
HVAC Solutions in the Steel Industry
Indoor Air Quality Control
Comfort and Efficiency at Worten’s Headquarters
Sustainable Technology for Retail
Comfort and Efficiency
Integrated HVAC and SACE Solution
Refurbishment with HVAC and BMS Solutions
Building-Wide Air Conditioning Installation
Controlled Room Ventilation
Office climate control solution
RACE Solution on the Blue Line
HVAC and BMS Project
Climate Control and Smoke Ventilation System
Refrigeration, HVAC and BMS Installation
Ventilation and Climate Control Project
HVAC and Refrigeration Installation
HVAC System Installation
HVAC in healthcare facilities
Upgrade of the facilities
Expansion and Renovation of the Production Unit
Commercial Refrigeration Project
Condensing Equipment Renovation
Cleanroom Air Conditioning
HVAC in Healthcare Facilities
Power Generation and Control Rooms
Specialized Systems Project for ParkLake Shopping Center in Romania
HVAC and Refrigeration Project
Foundry in Estarreja
Thermal Plant for Cold and Ice Production
Renovation at Recheio Ramalde – RACE Project
Energy Efficiency Engineering
RACE Efficient Technology
HVAC Installation
Paper Production Unit in Sines
Energy Certification and IAQ
Integrated Consumption Management System
Installation of Climate Control, Smoke Extraction, and BMS
BMS Installation at Camões Building
Mechanical Installations at Vivaci Shopping Center
Technology and Sustainability Supporting Education
Installations across the five factories in Viana do Castelo
HVAC Installation at Hilton Hotel in Vilamoura
HVAC Project of the SONAE SIERRA Shopping Center
Consolidation of 30 Kitchens into a Single Facility
Air Force General Staff
Behind the Scenes of EURO 2004: Engineering in the Service of Sport
Factory ventilation across multiple production lines
Installation of Chilled Water Plant, Smoke Extraction, Distribution, and Air Conditioning