Ventilation system for the energy production unit and control rooms
The supply and installation of a ventilation system for the EDP Produção de Energia S.A. Baixo Sabor Dam. The ventilation project consists of two stages: the construction phase (to allow for the construction of the dam) and the final phase (the renewal of air in the control rooms and the heat transfer of the equipment in operation).